Follow Along on the Progress at Dockside Entertainment

February 2024 Updates 

February has been the month of hanging drywall, mudding, taping, sanding, and painting .

January 2024

Simulator Bay Update 

HD Sport has been on site at Dockside installing the five multi-sport simulator bays.

Playground Update 

The playground installation crew was in Dockside Entertainment the week of January 17th to start building the playground structure.  After installation and bolting the flooring subcontractors will come in and pour the rubber playground safe flooring.

 

Interior Paint Updates 

The back half the Dockside Entertainment Center's ceiling was painted on January 3rd  in preparation for playground equipment installation.

Mudding and taping of interior walls also started the first week of January including the simulator bays in preparation of simulator equipment delivery.

 

Bowling Alley Updates 

The back mechanical room and back wall and header for the back of the lanes is now framed up at Dockside Entertainment.

 

December 2023

Playground Equipment Update 

Indoor playground equipment was delivered to Dockside Entertainment on December 13, 2023

 

Multi-Sport Simulator Bay Updates 

The 5 multi-sport simulator bays have been framed, wired, and sheet rocked in Demember.

 

 